Garland solar project

  • Date: August 2016
  • Location: , Lancaster CA
  • Category: Electrical, mechanical and fire suppression
  • Project Owner: RE Garland, LLC

This 230-megawatt solar array in Southern California includes nearly 900,000 solar modules, 59,000 feet of fiber and 780 medium-voltage terminations. The 34.5-kV collection system consists of 168 poles with overhead conductors as well as 600 medium-voltage terminations and 110,000 feet of conductor.
Garland450