Dakota Prairie Refining

  • Date: Spring 2015
  • Location: 3815 116th Ave. SW, Dickinson ND
  • Category: Industrial construction, maintenance and turnaround
  • Project Owner: WBI Energy and Calumet Specialty Products Partners

Dakota Prairie Refining is the first new refinery to be built in the United States since the late 1970s. Located in western North Dakota, construction is slated to be complete by the end of 2014. Wagner Industrial Electric was initially contracted to provide site grounding and site lighting services. The scope of work was increased to include power and control systems in the inside battery limits area as well as the outside battery limits area. Wagner Industrial added savings to the project by providing value engineering to lower the cost of installation and accelerate electrical installation.
Refinery