LaCygne generating plant environmental retrofit

  • Location: 25166 E. 2200th Rd. , La Cygne KS
  • Category: Electrical, mechanical and fire suppression

Capital Electric Construction completed multiple air quality control projects at this generating plant. One project involved installing a new underground duct bank system, including more than 100,000 lineal feet of raceway ranging in size from two to six inches in diameter. Raceways included PVC and rigid galvanized steel-embedded raceways, and FRP elbows and nipples.
LaCygne3