Solar Star tower raise

  • Date: 2014
  • Location: , Los Banos CA
  • Category: Transmission, distribution, excavation and substation
  • Project Owner: Pacific Gas and Electric

This reconductor double-circuit project included new fiber and spanned 32 miles. Reconductor required the use of a helicopter.
Solar Star