  • Date: August 2015
  • Location: 2700 Bearcat Way, Cincinnati OH
  • Category: Electrical, mechanical and fire suppression
  • Project Owner: University of Cincinnati

ESI Electrical provided extensive electrical construction services on this $86 million renovation project.

Phase one of the project began with underground site utility relocation in December 2013. Phase two, the stadium renovation, began in July 2014. ESI’s scope of work included power distribution, general power, general lighting, lighting control, security access, low-voltage tele/data and fire alarm for the new five-story pavilion, along with all new sports lighting for the entire stadium.

The pavilion addition included suites, seating, patios, bar and lounge, a terrace, press room, restrooms and concessions.

Construction was complete in time for the first home football game in September 2015.