Greenspot
International Line Builders placed eight 10 foot x 20 foot vaults and 6,900 feet of trench with six 5-inch concrete encased duct bank. This underground system was built for the removal of a section of 33kV and 66kV overhead lines.
- Location: Highland, California
- Project owner: SCE Transmission