Sedan to Elk Junction
This project involved rebuilding a 69 kV line to 138 kV using 135 mono-steel poles. It included 17 structures on foundations and the balance of the structures being direct-embed.
- Location: Sedan, Kansas
- Owner: Evergy
This project involved rebuilding a 69 kV line to 138 kV using 135 mono-steel poles. It included 17 structures on foundations and the balance of the structures being direct-embed.